Park Blvd

Park Boulevard
The limits of the project are from Roosevelt Road to Crescent Boulevard. The improvements include pavement reconstruction from Roosevelt Road to Fairview Avenue and pavement rehabilitation from Fairview Avenue to Crescent Boulevard. Included in the above work is earth excavation, placement of aggregate subgrade, combination concrete curb and gutter, hot-mix asphalt pavement, portland cement concrete sidewalk, storm sewer, sanitary sewer repairs, water main installation, pavement markings, traffic staging, temporary detour, restoration, and all other appurtenant work required to complete the project.

Main Street

Main Street
The limits of the project are from Roosevelt Road to Fairview Avenue. The improvements include pavement rehabilitation, earth excavation, placement of aggregate subgrade, combination concrete curb and gutter, hot-mix asphalt pavement, portland cement concrete sidewalk, storm and sanitary sewer structure adjustments, pavement markings, restoration, and all other appurtenant work required to complete the project.

Start Date

Anticipated Start Date:
Main Street: April 30, 2018; dependent on weather.
Park Boulevard: June 11, 2018; dependent on weather and utility relocation work.

Wednesday, October 31, 2018

Construction Update - October 31, 2018

Please be advised that the Contractor has notified residents on Park between Maiden and Fairview to refrain from the use of their driveway until the new curbs, driveway approaches, sidewalks, and first two layers of asphalt paving are complete and sufficient for use.  The tentative schedule for this work is as follows:

Thursday, Nov. 1 – Roadway will be graded for curb installation
Friday, Nov. 2 – Curb will be installed on Park from Maiden to Fairview
Monday, Nov. 5 – Wednesday, November 7 – Driveways will be excavated, stoned, and poured.
Thursday, Nov. 8 and Friday Nov. 9 – First two layers of asphalt will be paved
Monday, Nov. 12 – Driveways will be re-opened for use by residents

Please legally park your vehicles on adjacent side streets that are not under construction such as DuPage, Exmoor, Summerdale, and Stephanie.  Please abide by the no parking signs, face your vehicle in the correct direction of traffic, and do not block fire hydrants and driveways.  The Police Department has been notified to not ticket vehicles that are parked overnight on side streets in the area, so long as they are parked legally otherwise.


Weather permitting, the remaining work including restoration of parkways, paving of the asphalt surface course, and pavement markings is currently anticipated to be completed by Nov. 21.  However, the contractor is striving to complete the work sooner, as possible.